Go To Search
Click to Home
Click to Home
Water Usage Table

 

June 2015

- Water Usage Figures

DATE

TOTAL WATER PRODUCTION TO DISTRIBUTION
IN
MILLION GALLONS (MG)

SAFE OPERATING CAPACITY OF SYSTEM
(MG)

DAILY SAFE OPERATING CAPACITY IN %

7 DAY RUNNING AVERAGE

DROUGHT STAGE

1-Jun

3.245

6.120

53.0%

51.2%

Stage 2

2-Jun

3.396

6.120

55.5%

51.9%

Stage 2

3-Jun

3.687

6.120

60.2%

52.9%

Stage 2

4-Jun

3.181

6.120

52.0%

54.0%

Stage 2

5-Jun

3.636

6.120

59.4%

55.2%

Stage 2

6-Jun

3.821

6.120

62.4%

56.6%

Stage 2

7-Jun

4.287

6.120

70.0%

58.9%

Stage 2

8-Jun

3.687

6.120

60.2%

60.0%

Stage 2

9-Jun

4.356

8.738

49.9%

59.2%

Stage 2

10-Jun

4.681

8.738

53.6%

58.2%

YRM

11-Jun

4.027

8.738

46.1%

57.4%

YRM

12-Jun

3.663

8.738

41.9%

54.9%

YRM

13-Jun

4.900

8.738

56.1%

54.0%

YRM

14-Jun

4.866

8.738

55.7%

51.9%

YRM

15-Jun

3.376

8.738

38.6%

48.8%

YRM

16-Jun

3.625

8.738

41.5%

47.6%

YRM

17-Jun

3.884

8.738

44.4%

46.3%

YRM

18-Jun

2.975

8.738

34.0%

44.6%

YRM

19-Jun

3.294

8.738

37.7%

44.0%

YRM

20-Jun

3.407

8.738

39.0%

41.6%

YRM

21-Jun

3.368

8.738

38.5%

39.1%

YRM

22-Jun

3.074

8.738

35.2%

38.6%

YRM

23-Jun

3.401

8.738

38.9%

38.3%

YRM

24-Jun

 

8.738

 

 

 

25-Jun

 

8.738

 

 

 

26-Jun

 

8.738

 

 

 

27-Jun

 

8.738

 

 

 

28-Jun

 

8.738

 

 

 

29-Jun

 

8.738

 

 

 

30-Jun

 

8.738

 

 

 

 

 

8.738

 

 

 

 

 

*NOTE:

Safe Operating Capacity is defined as 75% of the total operating capacity

June 2015

- Water Usage Figures

DATE

TOTAL WATER PRODUCTION TO DISTRIBUTION
IN
MILLION GALLONS (MG)

SAFE OPERATING CAPACITY OF SYSTEM
(MG)

DAILY SAFE OPERATING CAPACITY IN %

7 DAY RUNNING AVERAGE

DROUGHT STAGE

1-Jun

3.245

6.120

53.0%

51.2%

Stage 2

2-Jun

3.396

6.120

55.5%

51.9%

Stage 2

3-Jun

3.687

6.120

60.2%

52.9%

Stage 2

4-Jun

3.181

6.120

52.0%

54.0%

Stage 2

5-Jun

3.636

6.120

59.4%

55.2%

Stage 2

6-Jun

3.821

6.120

62.4%

56.6%

Stage 2

7-Jun

4.287

6.120

70.0%

58.9%

Stage 2

8-Jun

3.687

6.120

60.2%

60.0%

Stage 2

9-Jun

4.356

8.738

49.9%

59.2%

Stage 2

10-Jun

4.681

8.738

53.6%

58.2%

YRM

11-Jun

4.027

8.738

46.1%

57.4%

YRM

12-Jun

3.663

8.738

41.9%

54.9%

YRM

13-Jun

4.900

8.738

56.1%

54.0%

YRM

14-Jun

4.866

8.738

55.7%

51.9%

YRM

15-Jun

3.376

8.738

38.6%

48.8%

YRM

16-Jun

3.625

8.738

41.5%

47.6%

YRM

17-Jun

3.884

8.738

44.4%

46.3%

YRM

18-Jun

 

8.738

 

 

 

19-Jun

 

8.738

 

 

 

20-Jun

 

8.738

 

 

 

21-Jun

 

8.738

 

 

 

22-Jun

 

8.738

 

 

 

23-Jun

 

8.738

 

 

 

24-Jun

 

8.738

 

 

 

25-Jun

 

8.738

 

 

 

26-Jun

 

8.738

 

 

 

27-Jun

 

8.738

 

 

 

28-Jun

 

8.738

 

 

 

29-Jun

 

8.738

 

 

 

30-Jun

 

8.738

 

 

 

 

 

8.738

 

 

 

 

 

*NOTE:

Safe Operating Capacity is defined as 75% of the total operating capacity


City of Kerrville
701 Main Street
Kerrville, TX 78028
830-257-8000