Construction Requirements

  1. --- Revised secured Tech Plat Fire Review Sheet_July-2022
  2. --- Temporary Backflow preventor
  3. Section 1 -- Adopted Codes
  4. Section 1 -- Interpretations to the 2018 edition, International Fire Code
  5. Section 2 -- Plan Review Process -- Commercial Site Plans
  6. Section 4 -- Above Ground Fire Sprinkler System
  7. Section 4 -- Fire Alarm System
  8. Section 4 -- Fire Department Connections
  9. Section 4 -- Kitchen Cooking Hood Fire Suppression System
  10. Section 4 -- Monitoring of Fire Alarm Systems
  11. Section 4 -- Standpipes
  12. Section 4 -- Underground Fire Main
  13. Section 5 -- Access Controlled or Delayed Egress Doors
  14. Section 5 -- Bonfire and Recreational Fires
  15. Section 5 -- Class IIIB Lquids Above Ground Storage Tanks
  16. Section 5 -- Controlled Outdoor Burning
  17. Section 5 -- Hazardous Materials
  18. Section 5 -- High Piled or High Rack Storage
  19. Section 5 -- Model Rocketry
  20. Section 5 -- Permanent Above Ground Storage Tanks for Flammable and Combustible Liquids
  21. Section 5 -- Pyrotechnics
  22. Section 5 -- Temporary Above Ground Storage Tanks
  23. Section 5 -- Temporary Above Ground Storage Tanks -- Flammable Liquids
  24. Section 5 -- Tent, Canopy, Membrane Structure
  25. Section 5 -- Under Ground Flammable and Combustible Liquid Storage Tank
  26. Section 6 -- Fire Hydrants
  27. Section 6 -- Fire Lanes
  28. Section 6 -- Fire Watch
  29. Section 6 -- KNOX Key Box
  30. Section 7 -- Final Fire Inspections
  31. Section 7 -- Inspection Process Details
  32. Section 7 -- Inspection Requests
  33. Section 7 -- Summary of Required Inspections
  34. Section 8 -- Asphalt Kettles and Tar Pits
  35. Section 8 -- Fire Sprinkler Underground Inspection Requirements
  36. Section 8 -- Propane Exchange
  37. Section 8 -- Special Amusement Buildings
  38. Section 8 -- Underground Fuel Storage Tank Removal
  39. Section 9 -- Multi-Family and Commercial Multi-Building Address Signs
  40. Section 9 -- Certificate of Occupancy Checklist -- Commercial Building
  41. Section 9 -- Fire Department Connection Sign Requirements
  42. Section 9 -- General Contractors Checklist
  43. Section 9 -- High-Piled Storage Requirements
  44. Section 9 -- Installation Checklist for Above Ground Combustible and Flammable Liquid Storage Tanks
  45. Section 9 -- Installation Checklist for Underground Combustible or Flammable Liquids Storage Tanks
  46. Section 9 -- KNOX Equipment Purchasing
  47. Section 9 -- New Construction Process Flow Chart