- Home
- Departments
- Fire Department
- Fire Marshal
- Construction Requirements
Construction Requirements
- --- Revised secured Tech Plat Fire Review Sheet_July-2022
- --- Temporary Backflow preventor
- Section 1 -- Adopted Codes
- Section 1 -- Interpretations to the 2018 edition, International Fire Code
- Section 2 -- Plan Review Process -- Commercial Site Plans
- Section 4 -- Above Ground Fire Sprinkler System
- Section 4 -- Fire Alarm System
- Section 4 -- Fire Department Connections
- Section 4 -- Kitchen Cooking Hood Fire Suppression System
- Section 4 -- Monitoring of Fire Alarm Systems
- Section 4 -- Standpipes
- Section 4 -- Underground Fire Main
- Section 5 -- Access Controlled or Delayed Egress Doors
- Section 5 -- Bonfire and Recreational Fires
- Section 5 -- Class IIIB Lquids Above Ground Storage Tanks
- Section 5 -- Controlled Outdoor Burning
- Section 5 -- Hazardous Materials
- Section 5 -- High Piled or High Rack Storage
- Section 5 -- Model Rocketry
- Section 5 -- Permanent Above Ground Storage Tanks for Flammable and Combustible Liquids
- Section 5 -- Pyrotechnics
- Section 5 -- Temporary Above Ground Storage Tanks
- Section 5 -- Temporary Above Ground Storage Tanks -- Flammable Liquids
- Section 5 -- Tent, Canopy, Membrane Structure
- Section 5 -- Under Ground Flammable and Combustible Liquid Storage Tank
- Section 6 -- Fire Hydrants
- Section 6 -- Fire Lanes
- Section 6 -- Fire Watch
- Section 6 -- KNOX Key Box
- Section 7 -- Final Fire Inspections
- Section 7 -- Inspection Process Details
- Section 7 -- Inspection Requests
- Section 7 -- Summary of Required Inspections
- Section 8 -- Asphalt Kettles and Tar Pits
- Section 8 -- Fire Sprinkler Underground Inspection Requirements
- Section 8 -- Propane Exchange
- Section 8 -- Special Amusement Buildings
- Section 8 -- Underground Fuel Storage Tank Removal
- Section 9 -- Multi-Family and Commercial Multi-Building Address Signs
- Section 9 -- Certificate of Occupancy Checklist -- Commercial Building
- Section 9 -- Fire Department Connection Sign Requirements
- Section 9 -- General Contractors Checklist
- Section 9 -- High-Piled Storage Requirements
- Section 9 -- Installation Checklist for Above Ground Combustible and Flammable Liquid Storage Tanks
- Section 9 -- Installation Checklist for Underground Combustible or Flammable Liquids Storage Tanks
- Section 9 -- KNOX Equipment Purchasing
- Section 9 -- New Construction Process Flow Chart